Projects — KCK Infra Projects
The complete portfolio

Nine packages. Three zonal railways.

Every railway package executed by the KCK group — road under bridges, a 45° skew road over bridge, major bridge rebuilding and complete station construction — for Southern, South Central and South Western Railway.

0Packages
0Road under bridges
0Major bridges rebuilt
0Station yards built new
0Zonal railways
Package register

The register

Every package on one ledger — the way a divisional works branch would keep it. Select a row to jump to its card.

PkgSectionWorkRailway
PKG·01Nagasamudram · Chakarlapalli · Pandiparthi3 road under bridges — LC 103, 72, 69South Western
PKG·02Thiruvarur–PattukkottaiMajor bridges 217 & 224 — Agr No. 16Southern
PKG·03Thiruvarur–PattukkottaiMajor bridges 233 & 251 — Agr No. 17Southern
PKG·04Vayalpad–Kalikiri3 road under bridges — LC 104, 106, 115South Central
PKG·05Vayalpad–Kalikiri3 road under bridges — LC 102, 103, 07South Central
PKG·06Regadipalli–VanganuruRoad over bridge — 45° skew, PSC 'I' girderSouth Central
PKG·07Thiruthuraipoondi · Thillaivilagam · Muthupet3 complete station yardsSouthern
PKG·08TirupatiStation FOB, platform & service building worksSouth Central
PKG·09Dharmavaram–Pakala & adjacent sections19 road under bridges — direct award to JVSouth Central
Project cards

All nine, in the order the profile records them

Filter by type of work or by zonal railway. Packages with a dedicated page link through to the full story — photographs, drawings and the document trail.

Road under bridge works on the South Western RailwaySouth Western RlyPKG·01
Nagasamudram · Chakarlapalli · Pandiparthi

Road Under Bridges — LC 103, 72 & 69

Three RCC box road under bridges built in lieu of level crossings, with boxes cast beside the line and jacked into position under traffic blocks on running track.

Sub-contract executionView page →
Major railway bridge on the Thiruvarur–Pattukkottai sectionSouthern RlyPKG·02
Thiruvarur–Pattukkottai gauge conversion

Major Bridges 217 & 224 — Agr No. 16

Rebuilding of two major bridges for broad gauge with PSC 'U' girder superstructure, part of the four-bridge renewal on the converted line.

Sub-contract executionView page →
PSC girder bridge under constructionSouthern RlyPKG·03
Thiruvarur–Pattukkottai gauge conversion

Major Bridges 233 & 251 — Agr No. 17

The second bridge package on the same corridor: two further major bridges rebuilt with PSC 'U' girders, including work over live waterways with river protection.

Sub-contract executionView page →
Road under bridge with approaches on the Vayalpad–Kalikiri sectionSouth Central RlyPKG·04
Vayalpad–Kalikiri

Road Under Bridges — LC 104, 106 & 115

Three level crossings eliminated with RCC box RUBs, approach roads and retaining structures on the Vayalpad–Kalikiri section.

Sub-contract executionView page →
Completed road under bridgeSouth Central RlyPKG·05
Vayalpad–Kalikiri

Road Under Bridges — LC 102, 103 & 07

A companion package on the same section: three further crossings replaced with RCC box structures and finished road approaches.

Sub-contract executionView page →
Road over bridge with PSC girders near VanganuruSouth Central RlyPKG·06
Regadipalli–Vanganuru

Road Over Bridge — 45° skew crossing

A road over bridge carrying the road across the railway on a true 45° skew — 28.284 m skew spans over a 20 m square crossing — with PSC 'I' girders and RCC slab.

Sub-contract executionView page →
Completed station yard at elevated viewSouthern RlyPKG·07
Thiruvarur–Pattukkottai gauge conversion

Station Buildings — Three Complete Yards

Station buildings, platforms, shelters, foot over bridges and every passenger amenity at Thiruthuraipoondi, Thillaivilagam and Muthupet. Certified complete 24.07.2019.

Sub-contract executionView page →
Platform and station works at TirupatiSouth Central RlyPKG·08
Tirupati

Tirupati Station — FOB & Platform Works

Foot over bridge, service building balance work, passenger platform, and watering and drainage arrangements at one of South India's busiest pilgrim stations.

Sub-contract executionPage in preparation
Road under bridge construction on the Dharmavaram–Pakala sectionSouth Central RlyPKG·09
Dharmavaram–Pakala & adjacent sections · Guntakal Division

Nineteen Road Under Bridges — Direct Award

Nineteen RUBs in lieu of manned and unmanned level crossings, awarded directly to Teja–MVVS–KCK (JV) under LOA dt. 10.10.2017 with a nine-month programme.

Direct award · JVView page →
How the work was held

Straight about attribution

Eight of the nine packages were tendered to prime contractors and executed in full by KCK entities as sub-contractor on back-to-back terms — own finance, men, material and machinery, to the railway's rates, milestones and specifications. The nineteen-RUB package (PKG·09) was awarded directly to Teja–MVVS–KCK (JV) by South Central Railway headquarters, Secunderabad.

Each project page carries its own document trail — tender numbers, letters of acceptance, agreements and completion certificates — so the record speaks for itself.

Continue

Get in touch about your next package

Contact KCK Infra →
KCK INFRA PROJECTS
Railway civil infrastructure · Kadapa, Andhra Pradesh
© KCK Infra Projects