Seventeen years, one line of work.

From a single proprietorship taking small railway contracts to bridges, subways and whole stations across three zones — built one structure at a time.

37Structures delivered
28Level crossings closed
9Railway packages
3Railway zones

Our story

We never diversified. That was the point.

KCK Infra Projects was founded in 2009 by Sri K. Subba Rami Reddy, working out of Kadapa in Andhra Pradesh. The firm started where most railway contractors start — small civil packages, taken as a sub-contractor, on sections of the South Central network.

What followed was not expansion into new sectors. It was going deeper into one. Subways under running track, then bridges over rivers, then whole stations. Every year the packages got larger and the engineering got harder, but the work stayed the same kind of work.

The line has to be handed back on time. Everything else in this business follows from that.

Today the group operates through four entities — a proprietorship, a partnership firm and two joint ventures — matched to the scale of each package, and has delivered for South Central, Southern and South Western Railway.

Precast RCC box segment launched beneath a live railway line

Work in hand

By 2017 there were eight packages running at once.

Every bar below is a real contract, plotted from its award date to its completion. The overlap is the story — bridges in Tamil Nadu, a road over bridge in Andhra Pradesh and nineteen subways across six sections, all live in the same season.

Certified complete Completed to programme

Source: work orders, letters of acceptance and completion certificates, KCK Infra company profile v1.7.
Bars in blue end at the contractual programme date where the profile records no completion certificate.

Year by year

How the work grew.

Each entry is anchored to a contract, an acceptance date or a completion certificate from our record.

2009To be confirmed

The firm is founded

Sri K. Subba Rami Reddy establishes KCK Infra as a proprietorship in Kadapa, Andhra Pradesh, taking railway civil sub-contract work on the South Central network.

Kadapa, Andhra PradeshProprietorship
2010 — 2014Detail to be supplied

Building the record

Five years of smaller civil packages taken as a sub-contractor, establishing the working relationships and site record that later tenders would depend on. The company profile does not list these individually.

Sub-contract worksSouth Central Railway
2015First major package

Three subways under the Bangalore–Dharmavaram line

Work commences in February on subways in lieu of level crossings 103, 72 and 69 for South Western Railway. At Nagasamudram a 5.0 × 4.5 m RCC box is built across three tracks by cut-and-cover; at Chakarlapalli and Pandiparthi the boxes are cast beside the formation and rolled into position under live traffic.

  • Feb 2015Nagasamudram, Chakarlapalli & Pandiparthi subways commenceLC 103, 72 & 69 · South Western Railway, Bangalore Division
3 structures3 crossings closed4 months + 3 maintenance
RCC box being launched beneath the railway line at Nagasamudram
2016Four acceptances

Into major bridges and road over bridges

The step change. Two major bridge packages on the Thiruvarur–Pattukkottai gauge conversion are accepted in June, replacing steel girder spans with 18.70 m PSC ‘U’ girders. August brings the two-lane road over bridge at Regadipalli–Vanganur, and October and November two further road under bridge packages for Guntakal Division.

  • 16 JunMajor bridges 217 & 224 acceptedCh. 40000 & 41614 · 2 × 18.70 m PSC ‘U’ girder each · Southern Railway
  • 16 JunMajor bridges 233 & 251 acceptedPandavayar & Vellaiyar rivers · 3 × 18.70 m PSC ‘U’ girder each
  • 16 AugRoad over bridge, Regadipalli–Vanganur acceptedKm 347/33–35 · 3 spans on pile foundations · South Central Railway
  • 18 OctThree road under bridges acceptedLC 102, 103 & 07 · Vayalpad–Kalikiri and Pakala–Puthlapattu
  • 28 NovThree road under bridges acceptedLC 104, 106 & 115 · Vayalpad–Kalikiri and Kalikiri–Piler
11 structures awarded2 railway zones
PSC U girder bridge span over a river
2017Biggest year for awards

Stations, Tirupati, and nineteen bridges at once

Three major awards in five months, and the road over bridge goes into construction. October brings the largest contract in the group’s record — nineteen road under bridges across six sections of Guntakal Division, awarded to the Teja–MVVS–KCK joint venture.

  • 10 FebRoad over bridge construction commences42.496 m composite steel-and-RCC girder over the tracks
  • 24 MayStation buildings package awardedThiruthuraipoondi, Thillaivilagam & Muthupet · Southern Railway
  • 19 AugTirupati station southern entry development awardedService buildings, Platform 6, cover over platform, FOB extensions
  • 10 OctNineteen road under bridges awardedSix sections, Guntakal Division · Teja–MVVS–KCK JV
23 structures awarded8 packages active
Railway station building and platform under construction
2018First major completions

Bridges handed over, the road over bridge opens

The 2016 awards reach completion. Bridges 217 and 224 are handed over in June with their steel girder spans replaced. In November the Regadipalli–Vanganur road over bridge is completed — three spans on pile foundations, including the 42.496 m composite girder over the running lines.

  • 10 JunMajor bridges 217 & 224 completedCertified by Southern Railway
  • 10 NovRoad over bridge, Regadipalli–Vanganur completedCertified by South Central Railway
3 structures completed2 certificates issued
Completed road over bridge spanning the railway
2019Largest package delivered

Nineteen road under bridges, handed over

The biggest delivery in the group’s history. In November the nineteen-RUB package completes — nineteen separate structures across six sections, run as parallel work fronts with coordinated traffic blocks at every site. In December, bridges 233 and 251 over the Pandavayar and Vellaiyar rivers are handed over.

  • 16 NovNineteen road under bridges completed19 structures · 6 sections · Guntakal Division
  • 13 DecMajor bridges 233 & 251 completedPandavayar & Vellaiyar rivers · Southern Railway
21 structures completed19 crossings closed
Completed road under bridge with concrete retaining walls
2020 — 2026Awaiting content

Recent and current work

Placeholder. The company profile supplied lists no packages after 2019, so nothing here is drawn from source material. Add current and recent contracts, new registrations, plant additions or certifications — then remove this note.

To be supplied by client

Group structure

Four entities, matched to the package.

Railway packages vary from a single subway to nineteen structures at once. The group is built to bid at either end of that range.

Proprietorship

KCK Infra

The founding entity, and the one carrying the longest continuous record on the network.

Founded 2009

Partnership firm

KCK Infra Projects

Formed to take on larger direct packages as the scale of the work increased.

Registered firm

Joint venture

Teja–MVVS–KCK

The vehicle for the nineteen-RUB package — the largest contract in the group’s record.

19 structures delivered

Joint venture

MVVS–KCK

The most recent entity in the group, formed for collaborative packages.

Active from 2020
KSRPortrait to be supplied

Leadership

Sri K. Subba Rami Reddy

Founder & Proprietor

The firm has had one head since it started. Every package in the record — the first subways at Nagasamudram, the nineteen-RUB contract, the station buildings at Thiruthuraipoondi — was taken and delivered under the same signature.

That continuity is what a railway client is buying. Traffic blocks are granted on trust, and trust in this business is built slowly, by handing the line back when you said you would.

Kadapa, Andhra PradeshFounder since 20094 entities

What holds it together

Three things we do not compromise.

The block is sacred

A traffic block is a few hours, granted once. Everything that can be done off the track is finished before it starts, so the line goes back when it was promised.

Certificates, not claims

Every package in our record carries a work completion certificate issued by the Railway. The documents are available to any client who asks for them.

One line of work

We have never moved into sectors we do not know. Seventeen years of railway civil work is the only thing on our record, and it is the only thing we bid for.