KCK Infra Projects — Railway Civil Infrastructure
Railway station platforms with shelters and a train
New railway bridge span carrying track
Road under bridge beneath a railway line
01 / 03

Railway civil infrastructure · Since 2010

We build what trains run over and roads run under.

Box pushing beneath live track. PSC girders launched across rivers. Station buildings raised while trains keep arriving. Delivered for South Central, Southern and South Western Railway.

13+Years on the network
33Bridges & RUBs built
28Level crossings closed
3Railway zones served

Who we are

Railway civil work is unforgiving. That is the work we chose.

KCK Infra Projects is a railway civil contractor based in Kadapa, Andhra Pradesh, working across South India since 2010. Our structures sit under and over running track, and every one of them has to be handed back to the Railway inside a sanctioned block, to gauge, on schedule.

Founded and led by Sri K. Subba Rami Reddy, the firm works as a proprietorship, a partnership and through joint ventures depending on the scale of the package.

  • South Central Railway — Guntakal Division & Construction Organisation, Secunderabad
  • Southern Railway — Construction Organisation, Chennai & Egmore
  • South Western Railway — Bangalore Division
See the record
Precast RCC box segment being launched beneath a live railway line
₹133crWorks turnover, FY 2010–11 to FY 2022–23

How it is done

Putting a box under a line that never stops.

A road under bridge cannot close the railway. The box is built beside the track and moved into position inside a block of a few hours. Scroll through the sequence.

Excavation and approach cutting at the crossing site RCC box segments cast beside the railway formation Box segment being lifted and launched into position Completed subway with approach road open to traffic
Step 01

Cut the approach, hold the track

Excavation begins either side of the formation while the line stays open. In rock, that means controlled breaking within metres of a running track, with the embankment supported throughout.

Step 02

Cast the box beside the line

RCC box segments are cast on a prepared bed alongside the formation, clear of traffic. Reinforcement, shuttering and curing all happen off the track, so the critical work is ready before any block is taken.

Step 03

Take the block, move the box

Inside a sanctioned traffic block the track is supported on released rails, and the box is jacked and rolled into its final position under the line. This is the hour that decides the job.

Step 04

Restore the track, open the road

Track is relaid and packed to gauge, the line is handed back, and the approach roads, wing walls and drainage are completed. The level crossing is gone for good.

What we build

Six things, done properly.

We do not spread across sectors. Everything here is railway civil work, and everything here we have built and handed over.

Completed road under bridge
01

Road Under Bridges & Subways

RCC boxes built by cut-and-cover, or cast beside the formation and pushed into place by jacking and rolling while trains keep running overhead.

Box pushing · Cut & cover · Live blocks
Road over bridge girders from below
02

Road Over Bridges

Multi-span ROBs on pile foundations, combining PSC girder spans with composite steel-and-RCC deck spans to clear the tracks below.

PSC girders · Composite decks · Piling
PSC U girder railway bridge over a river
03

Major Railway Bridges

Ageing steel girder bridges replaced with PSC ‘U’ girder spans, including substructure in river conditions and full protective works.

18.70 m PSC ‘U’ girder · River protection
Completed railway station building
04

Station Buildings & Amenities

Whole station complexes — buildings, platforms, shelters, foot over bridges, toilets, drainage, circulating areas and approach roads.

Buildings · Platforms · FOBs · Shelters
Platform and approach road works
05

Platform & Permanent Way

Platform extension and surfacing, cover over platform, washable aprons, AT welding of rail joints, watering and drainage arrangements.

AT welding · Washable aprons · COP
Road under bridge replacing a level crossing
06

Level Crossing Elimination

Unmanned and manned crossings closed and replaced with grade-separated structures — the biggest safety programme on the network.

28 crossings eliminated
0cr+Works turnover
0Railway packages
0Bridges & RUBs
0Railway zones

Why KCK

What the Railway actually gets.

Work under live traffic

Box pushing, girder launching and platform work carried out inside sanctioned blocks, with the line handed back on time.

Certificates, not claims

Every package in our record carries a work completion certificate issued by the Railway. Available on request.

Nineteen sites at once

Our largest package ran nineteen structures across six sections simultaneously — parallel fronts, crews and plant, one programme.