The work
Convert the gauge and the old bridges have to go.
When a metre gauge line is converted to broad gauge, the track is only part of the job. Broad gauge stock is heavier and faster, and structures designed for the old loading cannot simply be re-decked and reused.
On the Thiruvarur–Pattukkottai conversion, four major bridges carrying the line over watercourses in the Cauvery delta needed replacing outright — new foundations, new substructure, new superstructure, and full river protective works either side.
Delta rivers do not wait. Substructure in a watercourse means working the season, not the programme.
We took both packages for Southern Railway's Construction Organisation at Chennai, accepted on the same day in June 2016, and replaced twelve short steel girder spans with ten long prestressed concrete spans.