The firm is founded
Sri K. Subba Rami Reddy establishes KCK Infra as a proprietorship in Kadapa, Andhra Pradesh, taking railway civil sub-contract work on the South Central network.
Home / About us
From a single proprietorship taking small railway contracts to bridges, subways and whole stations across three zones — built one structure at a time.
Our story
KCK Infra Projects was founded in 2009 by Sri K. Subba Rami Reddy, working out of Kadapa in Andhra Pradesh. The firm started where most railway contractors start — small civil packages, taken as a sub-contractor, on sections of the South Central network.
What followed was not expansion into new sectors. It was going deeper into one. Subways under running track, then bridges over rivers, then whole stations. Every year the packages got larger and the engineering got harder, but the work stayed the same kind of work.
The line has to be handed back on time. Everything else in this business follows from that.
Today the group operates through four entities — a proprietorship, a partnership firm and two joint ventures — matched to the scale of each package, and has delivered for South Central, Southern and South Western Railway.
Work in hand
Every bar below is a real contract, plotted from its award date to its completion. The overlap is the story — bridges in Tamil Nadu, a road over bridge in Andhra Pradesh and nineteen subways across six sections, all live in the same season.
Source: work orders, letters of acceptance and completion certificates, KCK Infra company profile v1.7.
Bars in blue end at the contractual programme date where the profile records no completion certificate.
Year by year
Each entry is anchored to a contract, an acceptance date or a completion certificate from our record.
Sri K. Subba Rami Reddy establishes KCK Infra as a proprietorship in Kadapa, Andhra Pradesh, taking railway civil sub-contract work on the South Central network.
Five years of smaller civil packages taken as a sub-contractor, establishing the working relationships and site record that later tenders would depend on. The company profile does not list these individually.
Work commences in February on subways in lieu of level crossings 103, 72 and 69 for South Western Railway. At Nagasamudram a 5.0 × 4.5 m RCC box is built across three tracks by cut-and-cover; at Chakarlapalli and Pandiparthi the boxes are cast beside the formation and rolled into position under live traffic.
The step change. Two major bridge packages on the Thiruvarur–Pattukkottai gauge conversion are accepted in June, replacing steel girder spans with 18.70 m PSC ‘U’ girders. August brings the two-lane road over bridge at Regadipalli–Vanganur, and October and November two further road under bridge packages for Guntakal Division.
Three major awards in five months, and the road over bridge goes into construction. October brings the largest contract in the group’s record — nineteen road under bridges across six sections of Guntakal Division, awarded to the Teja–MVVS–KCK joint venture.
The 2016 awards reach completion. Bridges 217 and 224 are handed over in June with their steel girder spans replaced. In November the Regadipalli–Vanganur road over bridge is completed — three spans on pile foundations, including the 42.496 m composite girder over the running lines.
The biggest delivery in the group’s history. In November the nineteen-RUB package completes — nineteen separate structures across six sections, run as parallel work fronts with coordinated traffic blocks at every site. In December, bridges 233 and 251 over the Pandavayar and Vellaiyar rivers are handed over.
Placeholder. The company profile supplied lists no packages after 2019, so nothing here is drawn from source material. Add current and recent contracts, new registrations, plant additions or certifications — then remove this note.
Group structure
Railway packages vary from a single subway to nineteen structures at once. The group is built to bid at either end of that range.
Proprietorship
The founding entity, and the one carrying the longest continuous record on the network.
Founded 2009Partnership firm
Formed to take on larger direct packages as the scale of the work increased.
Registered firmJoint venture
The vehicle for the nineteen-RUB package — the largest contract in the group’s record.
19 structures deliveredJoint venture
The most recent entity in the group, formed for collaborative packages.
Active from 2020Leadership
Founder & Proprietor
The firm has had one head since it started. Every package in the record — the first subways at Nagasamudram, the nineteen-RUB contract, the station buildings at Thiruthuraipoondi — was taken and delivered under the same signature.
That continuity is what a railway client is buying. Traffic blocks are granted on trust, and trust in this business is built slowly, by handing the line back when you said you would.
What holds it together
A traffic block is a few hours, granted once. Everything that can be done off the track is finished before it starts, so the line goes back when it was promised.
Every package in our record carries a work completion certificate issued by the Railway. The documents are available to any client who asks for them.
We have never moved into sectors we do not know. Seventeen years of railway civil work is the only thing on our record, and it is the only thing we bid for.
Get in touch
Tender enquiries, sub-contract packages and joint ventures — send the scope and we will come back with our record on similar work.